Category: Uncategorized
-
Project Update4
DECEMBER 2023 Slab Edge Ongoing (New slab edge 3) (New slab edge 4) (New curb 1) (New curb 2) Framing, Insulation, DensGlass and Waterproofing Framing 2 (DensGlass install 1) (DensGlass-waterproofing caulk) (Waterproofing 1) Waterproofing 2 Traffic Coating Preparation Walkway Slab Prep 2
-
Project Update3
NOVEMBER 2023 Slab Edge Demolition Slab Edge Demo 2 Steel Rust Inhibitor Application and Framing Electric Rough-in Insulation and Framing Start
-
Project Update2
OCTOBER 2023
-
Project Update1
SEPTEMBER 2023 Existing ceiling demo (ceiling demo west) Scaffold Photos Project Signs Slab Edge Demo (slab edge demo 1) (slab edge demo 3)
-
Thanks for checking in!
Project Update Links for Pinellas Technical College https://hcsfl.info/uncategorized/project-update-1/ EXTERIOR SOFFIT, WALL PANEL & WALKWAY ArchitectSpiezle ArchitecturalGroup, Inc. Tech Project site, PTEC. Pinellas Technical College 901 34th Street SouthSt. Petersburg FL 33711PTECinfo@hcsfl.com